Indoor climbing centre Bochum (D)
An old building of a mining company was transformed into the fourth Neoliet climbing gym. S&S was responsible for the design and realization of the entire interior. Axis Round Edges was responsible for the design and realization of the climbing walls. The cow was a gift of Axis and S&S to remember the Dutch influence after the opening.
|
|
![]()
![]()
|